BATTERY ENERGY STORAGE

P600

Explore the P600 for high-power battery storage projects. Review your required operating power, peak duration and battery-supported runtime with PowerArk to define the project configuration.

P600 battery storage exterior
Exterior illustration. Refer to the technical specification for the selected configuration.

System at a glance

Nominal battery capacity
564 kWh

Values refer to the linked datasheet. Final ratings, options and operating conditions are subject to the project technical agreement.

Please confirm rated output with PowerArk before selection. The exterior label is not a substitute for an agreed electrical specification.

Start with the site load

Begin the technical review with a time-based load profile, the existing generator specification and the site connection arrangement. The P600 product illustration shows the cabinet appearance; confirm the electrical ratings and operating conditions in the project technical agreement.

Battery, generator and site energy

A hybrid power project starts with the available energy sources and the load they need to support. Share your generator, mains and solar arrangements so PowerArk can review the system configuration and integration scope. Solar equipment and generator supply are agreed separately for each project.

Explore PowerArk EMS →

Plan the operating period

Nominal battery capacity is an energy rating, not a guaranteed runtime. Usable energy, load variation, conversion losses, temperature and reserve settings all affect the battery-supported operating period. Provide average and peak loads plus operating hours for a project-specific assessment.

Explore the range

LET’S BUILD YOUR ENERGY SYSTEM

Start with yourload requirements.

Tell us about your application, average and peak loads, operating hours, existing genset and solar, and delivery region.

Discuss your project