IN THE FIELD
A tunnel site in Tibet
A field view of a tunnel construction site and its power-equipment area in Tibet, with project-planning considerations for temporary construction power.

The worksite and its power area
The wide photograph includes the tunnel worksite and a sheltered power-equipment area. It shows the relationship between the working area and the space used for power equipment.
Planning a similar application
Construction power requirements can vary across shifts and work stages. Share the equipment schedule, simultaneous loads and starting requirements, along with the existing generator information. A time-based load profile is more useful for selecting storage than a list of nameplate ratings alone.
From the photograph to your project
Every site needs its own electrical and installation review. Share average and peak demand, operating hours, available energy sources and delivery region. PowerArk can then discuss a suitable storage and EMS integration scope for those requirements.
This page presents a field photograph, not a measured performance report.
More from PowerArk
HB1100 in XinjiangExplore the range
LET’S BUILD YOUR ENERGY SYSTEM
Start with yourload requirements.
Tell us about your application, average and peak loads, operating hours, existing genset and solar, and delivery region.
Discuss your project